Plan the entrance
before installation.
Coordinate the physical installation and technology setup before the gate arrives.
Plan the turnstile within the fence line
Start with the construction site fencing and the route workers take to the entrance. Confirm the opening, fence connections, adjoining pedestrian access and space for queues. Share a marked-up site plan so gate placement, footing and anchoring can be checked for the selected hardware.
Coordinate services
Allow for power and communications routes. The reference hardware lists a 220 V AC supply; final electrical requirements are confirmed during scoping.
Set up the system
Agree who is responsible for assembly, electrical works, reader installation, PLEXA configuration and commissioning. Confirm these inclusions in the quote.
Plan a future relocation
The documented hardware uses modular, bolt-together construction. A move still needs transport, new-site preparation, reassembly and recommissioning.

THE COMPLETE PICTURE
Part of one connected entrance.
Explore how the gate, access control and app come together in a project package.
See the complete packageLET’S TALK ABOUT YOUR SITE
Your next entrance
starts here.
Tell us about your project. We’ll help scope the gate, technology and setup.